Laserfiche WebLink
(vi) Typical mining or in-situ development sequence, with appropriate timeframes <br />Work on site began in 2006 with environmental assessments and continued in 2007 with the <br />locating of existing section corner monuments, marking the Lease corners, and conducting aerial <br />photography and mapping. <br />Phase I, currently in progress, will establish site-specific geo-hydrologic conditions of the mining <br />interval and the strata immediately above and below the mining interval. A summary of the <br />monitoring and exploration wells is presented in Section (4a)g). Phase I includes constructing <br />four well pads (Test Pad, TM Pad, HB Pad, and MWP 2 Pad). The MWP 1 Pad was pre- <br />existing. <br />Phase II will start with the In-Situ Pilot Retort Test described in detail in this POD. This Pilot <br />Test will use a combination of a deviated heater-producer test well, T-1, as shown schematically <br />in Figure 4-4, and up to six tomography wells for monitoring cavity growth. A detailed schedule <br />for the Pilot Test is given in Appendix 4-5. <br />0 <br />0 <br />47