Laserfiche WebLink
vj <br />Bowie No. 1 Mine C-81-038 <br />Task: 202 Site: Bowie Partial Phase I Bond Release si -n? <br />hermit Action: Partial Phase I Bond Release SL-03 <br />Description: Demolish and Remove All Structures at Train Loadout <br />Demolition Task <br />Coal Storage Silos Superstructure <br />(3) <br />- Slab (3) <br />- Footing (3) <br />lFop of Silo Transfer Building <br />MCC at Silo Superstructure <br />- Slab <br />Substation Superstructure <br />- Slab <br />- Slab <br />- Footing <br />Shop Building Superstructure <br />- Slab <br />- Slab <br />- Footing <br />Belt Structure - Overland Conveyor <br />Pump House at Silo Superstructure <br />- Slab <br />- Slab <br />- Walls (3) <br />Train Loadout Superstructure <br />- Superstructure <br />- Slab <br />- Slab <br />- Footing <br />- Fence <br />Date: 15 Nov 07 User: JRS <br />'County 'Delta - - - <br />File Name: C-1981-038 <br />Reference Quantity Unit Cost Total Cost <br />CIRCES <br />;CIRCES 1,270,000.00: CF $0.7993: $1,015,111.00 <br /> <br />CIRCES 0.00 <br /> <br />0 <br />00 SF <br /> <br />Cy $9.8900 <br />$0.00 <br /> . $92.5000 $0.00 <br />CIRCES 288,000.00: CF $0.7540 $217,152.00 <br />CIRCES <br />CIRCES 6,048.00 CF $0.7568 $4,577.13 <br /> 0.00; SF $4.7100 <br />$0.00 <br />CIRCES <br />CIRCES 8,640.00 CF $0.7540 <br />$6,514.56 <br />CIRCES 0.00 <br />0 <br />00 SF <br />SF $3.7700 $0.00 <br /> <br />'CIRCES . <br />0 <br />00 <br />LF $3.7700 <br />$0.00 <br /> . <br />; $15.9100 $0.00 <br />CIRCES <br />CIRCES 0.001 CF $0.7540 <br />$0.00 <br /> <br />CIRCES 0.00; SF <br />$4.7100. <br />$0.00 <br /> <br />!CIRCES 0.00 <br />0 <br />00 SF $4.7100 <br />$0.00 <br /> . <br />; LF $15.9100 $0._00 <br />;CIRCES 1,280.00' LF <br />$37.3500 <br />$47,808.00 <br />CIRCES <br />CIRCES f 512.00 CF <br />$0.7250 <br />$371.20 <br /> <br />'CIRCES 0.00 SF $4.7100 <br />$0.00 <br />CIRCES 0.00 <br />480 <br />00 SF <br />SF $3.7700 . $0.00 <br /> . $11.3160 $5,431._6__8_ <br />;CIRCES <br />CIRCES 169,344.00; <br /> <br />10 <br />800 <br />00 CF <br />$0.7540 <br />$127,685.38 <br /> <br />: <br />CIRCES , <br />. <br />0 <br />00' CF <br /> <br />SF $0.7540 <br />$8,143.20 <br /> <br />CIRCES <br />' . <br /> <br />0 <br />00 <br /> <br />SF $6.5900. <br />$0.00 <br /> <br />. <br />CIRCES . <br />: <br />0 <br />00 <br /> <br />LF $4.7100 <br />$0.00 <br />CIRCES . <br />0 <br />00 <br />LF $11-1200 $0.00 <br /> . $1.7800 $0.00 <br />Structural Demolition Page 2 of 4