Laserfiche WebLink
Bowie No. 1 Mine C-81-038 <br />Task: 2U2 Site' Rflw;. AI., I :_ Partial Phase I Bond Raleaca ci <br />- - „M <br />Permit Action: Partial Phase I Bond Release SL-03 <br />Description: Demolish and Remove All Structures at Train Loadout <br />Demolition Task <br />Truck Dump Superstructure <br />- Slab <br />- Footing <br />MCC at Truck Dump Superstructure <br />- Slab <br />MCC at Truck Dump (on Skids) <br />Scrubber Superstructure <br />- Footing <br />- Footing <br />Tunnel Building Superstructure <br />- Slab <br />- Footing <br />- Footing <br />- Concrete Tunnel <br />Truck Scale Superstructure <br />- Slab <br />- Slab <br />Silo Fan <br />- Wall <br />- Footing <br />Silo Buildings Superstructure (4) <br />- Slab (4) <br />Belt Structure - Overland Conveyor <br />'Date: 15 Nov 07 !User: JRS <br />'County Delta ; - - <br />File Name: 'C-1981-038 <br />Reference Quantity; Unit Cost Total Cosl <br />'CIRCES <br />CIRCES 19,200.00 <br />; CF <br />$0.7540 <br />$14,476.80 <br /> <br />CIRCES 0.00; SF $4.71001 $0.00 <br /> 0.00: LF $13.5960' - - <br />$0.0_0_ <br />;CIRCES 4,368.00 CF $0.7540' <br />$3 <br />293 <br />47 <br />CIRCES 0.00' SF $4.7100 <br />r , <br />. <br />$0.00 <br />-- <br />CIRCES 512.00 CF <br />$0.7250. <br />$_37.1_1.0 <br />!CIRCES <br />CIRCES 9,720.00 CF $0.7540 <br />$7,328.88 <br /> <br />CIRCES 0.00 <br />0 <br />00 LF $15.9100 $0.00 <br /> . LF $15.9100 <br />$0.00 <br />'CIRCES <br />CIRCES 28,800.00; CF $0.7540 $21,7 <br />15.20 <br /> <br />CIRCES 0.00 SF $4.7100 . <br />$0.00 <br />CIRCES 0.00 LF $15.9100 <br />$0 <br />00 <br /> <br />CIRCES j 0.00 LF $15.9100. , <br />$0.00 <br /> 0.00: SF $13.5960 <br />$0.00 <br />CIRCES <br />CIRCES 0.00; CF $0.7250 $0.00 <br /> <br />CIRCES 0.00! <br /> <br />0 <br />00 SF <br /> <br />SF $3.7700 <br />$0.00 <br /> . $4.7100 $0.00 <br />,CIRCES <br />CIRCES 7,680.00 CF <br />$0.7250 <br />$5,568.00 <br /> <br />CIRCES 300.00 SF $13.5960 $4 <br />,078.80 <br /> 0.00 i LF $15.9100 _ <br />$0. <br />0.0_ <br />CIRCES <br />CIRCES 2,048.00 CF <br />$0.7993 _ <br />$1,636.97 <br /> 0.00; SF $2.8300 $0.00 <br />CIRCES 610.00 <br />LF <br />$37.3500 <br />. <br /> <br />$22,783.50 <br />Structural Demolition Page 1 of 4