Laserfiche WebLink
Task: 202 <br />_-.1 +w. 1 111111C <br />Permit Action: Partial Phase I Bond Release SL-03 <br />Description: Demolish and Remove All Structures at Train Loadout <br />Demolition Task <br />MCC at Loadout Superstructure <br />- Slab <br />Pump House at Loadout Superstructure <br />- Slab <br />- Walls (3) <br />Miscellaneous Fencing <br />Rialroad Track <br />- Ballast <br />- Bridge Reclamation (Adjusted Cyprus Estimate) <br />500 Gallon Fuel Tanks (2) <br />- Remove Sludge from Tank Bottom <br />- Dispose of Sludge <br />- Add CO, for rank Cleaning <br />- Haul Tanks to Certified Dump <br />3,500 Gallon Tank <br />- Remove Sludge from Tank Bottom <br />- Dispose of Sludge <br />- Add CO, for Tank Cleaning <br />- Haul Tanks to Certified Dump <br />12,000 and 15,000 Gallon 1 anks <br />- Remove Sludge from Tank Bottom <br />- Dispose of Sludge <br />- Add CO2 for Tank Cleaning <br />- Haul Tanks to Certified Dump <br />Concrete Disposal Charges <br />Bowie No. 1 Mine C-81-038 <br />Partial Phase I Bond Release SL -03 <br />Date: 15 Nov 07 'User: JRS <br />;County Delta <br />File Name: !C-1981-038 <br />Reference <br />;CIRCES <br />'CIRCES <br />CIRCES <br />;CIRCES <br />;CIRCES <br />CIRCES <br />CIRCES <br />CIRCES <br />CIRCES <br />"CIRCES <br />CIRCES <br />CIRCES <br />'CIRCES <br />CIRCES <br />CIRCES <br />CIRCES <br />CIRCES <br />CIRCES <br />CIRCES <br />CIRCES <br />CIRCES <br />CIRCES <br />CIRCES <br />:CIRCES <br />CIRCES <br />Quantity <br />8,064.00 CF <br />0.00 , SF <br />0.00 CF <br />0.00 SF <br />0.00' SF <br />0.00 LF <br />1,500.00 LF <br />0.00: CY <br />0.00 EA <br />0.00, EA <br />0.00: EA <br />0.00 GAL <br />0.00 LB <br />0.001 EA <br />1.00 i EA <br />1.00 EA <br />r 350.00; GAL <br />53.00: LB <br />1.00 EA <br />2.00 EA <br />2.00 EA <br />2,700.00 GAL <br />405.00 LB <br />2.00 EA <br />3,710.00, CY <br />1 <br />Unit cost <br />$0.7250 <br />$4.7100 <br />$0.7250 <br />$4.7100 <br />$13.5960 <br />$1.7800 <br />$6.5200, <br />$2.7400 <br />$132,264.0000 <br />$342.5000, <br />$_145.5000 <br />$3.4500 <br />$1.7800 <br />$550.0000 <br />$342.5000 <br />$145.5000 <br />$3.4500 <br />$1.7800 <br />$550.0000 <br />$855.0000 <br />$242.5000 <br />$3.4500 <br />$1.7800 <br />$875.0000 <br />$10.4500, <br /> <br />Total Cos <br />$5,846.4( <br />$0.0C <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$9,780.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$342.50 <br />$145.50 <br />$1,207.50 <br />$94.34 <br />$550.00 <br />$1,710.00 <br />$485.00 <br />$9,315.00 <br />$720.90 <br />$1,750.00 <br />$38,769.50 <br />Structural Demolition Page 3 of 4