Laserfiche WebLink
State Reg. <br />• a. The blasting schedule will identify as accurately as <br />possible the location of the blasting sites and the <br />time periods when blasting will occur. <br />b. The blasting schedule will contain at a minimum: <br />1) identification of the specific areas in which <br />blasting will take place. The specific blasting <br />areas described will not be larger than 300 acres; <br />2) dates and times when explosives are to be <br />detonated; <br />3) methods to be used to control access to the <br />blasting area; <br />• 4) types of audible warnings and all clear signals to <br />be used before and after blasting; and <br />5) a description of unavoidable hazardous situations <br />referred to in 4.08.4(2 ) which have been approved <br />by the Division for blasting at times other than <br />those described in the schedule. <br />3. Public notice of changes in blasting schedules: <br />a. Peabody Coal Company will publish a revised blasting <br />schedule prior to blasting in areas not covered by <br />previous schedules. If blasting times are to be <br />changed, a revised schedule will also be published. <br />Revised schedules will be published according to the <br />procedures in 4.08.3(1) and (2). <br />• <br />12-43 Revised 8/27/86 <br />