My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-12_PERMIT FILE - C1980005 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980005
>
2009-05-12_PERMIT FILE - C1980005 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:24 PM
Creation date
5/19/2009 12:40:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
5/12/2009
Section_Exhibit Name
Tab 12 Operation Plan
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State Reg. <br />conditions or proposed adjustments to the blasting procedures • <br />which should be incorporated into the blasting plan to prevent <br />damage. Copies of the report shall be provided to the person <br />requesting the survey and to the Division. <br />If the person requesting the pre-blast survey disagrees with <br />the results of the survey, he or she may notify, in writing, <br />both Peabody Coal Company and the Division of their specific <br />areas of disagreement. <br />4.08.3 PUBLIC NOTICE OF BLASTING SCHEDULE <br />1. Blasting Schedule Publication <br />a. Peabody Coal Company will publish a blasting schedule <br />at least ten (10) days, but not more than twenty (20) <br />days, before beginning a blasting program in which more <br />than five (5) pounds of explosive or blasting agent are • <br />detonated. The schedule will be published in the <br />Hayden Valley Press. An example of the blasting <br />schedule is provided in Attachment 12-1. <br />b. Copies of the blasting schedule will be distributed by <br />mail to local governments ar~d public utilities, and by <br />mail or hand delivered to residents within one-half <br />mile of the blasting site as described in the schedule. <br />Copies sent to residences will be accompanied by <br />information advising the owner or resident how to <br />request a pre-blast survey. <br />c. Peabody Coal Company will republish the blasting <br />schedule at least every twelve (12) months, and also <br />redistribute the schedule by mail every twelve (12) <br />months. <br />2. Blasting Schedule Contents • <br />12-4^c Revised 8/27/86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.