State Rea. <br />• 4.03.1(3) Haul roads not within disturbance areas, (see F~d'ii.bit 12-1), <br />will be designed and constructed or reconstructed in <br />compliance with the following stan9axds in oxrler to control <br />erosion aryl disturbance of the hydrologic balance. <br />4.03.1(3)(a)2he vertical aligrmrnt of the haul roads at the Seneca II <br />Mine will not exceed 10 percent on the overall grade. rwYi,m,m <br />pitch grade will not exceed 15 percent, and there will not be <br />mare than 300 feet of pitch grade exceeding 10 percent within <br />any consecutive 1,000 feet (see F]chi.bit 12-1 for existing and <br />PruPosed grades) <br />4.03.1(3)(b)Zhe horizontal alignment will be consistent with the <br />existing and postmining topography and will be oooxrlinated <br />with the vertical alignment to ensure that the roads will not <br />cause excessive environmental damage. <br />• During road constYVCtion, Peabody will provide a number of <br />temporary erosion control mea~~s. Dapa~_*~ largely on the <br />locati~t of the road, one or a ccmibination of the methods <br />shown below will be e~loyed. <br />a. straw dikes or silt fence will be placed in drainages to <br />reduce the sediment load off site. <br />b. Diversion ditches or berms will be constructed above the <br />construction area to divert runoff around the area. <br />c. Diversion or check dams will be wnstruc,-ted if needed to <br />slag dawn or temporarily impound runoff. <br />After construction is c~npleted, all structures, when no <br />longer needed, will be removed and the area reclaimed. <br />• 4.03.1(3) Road cut slopes will not be steeper than 1v:1.5h in <br />12-25 Revised 10/01/86 <br />