Laserfiche WebLink
6.4.5 Exhibit E - Reclamation Plan <br />Concurrent Backfillinq Adjacent to Oil and Gas Structures <br />Agreements between ASCI and the owners of oil and gas structures specify that <br />mining can occur no closer than 75 ft from oil and gas well facilities as a <br />temporary condition. ASCI will backfill areas adjacent to oil and gas oil and gas <br />wells as shown on Exhibit C-2, Mine Plan Maps. Backfilling adjacent to oil and <br />gas structures to a radial distance of 200 ft will occur within two weeks following <br />excavation near oil and gas structures. The total volume of material needed to <br />backfill these areas is approximately 100,000-120,000 yd3 <br />Backfillinq Cell 1 <br />As of the date of this submittal, all of the overburden from Cell 1 has been <br />backfilled into the east half of Cell 1, which accounts for approximately 265,000 <br />yd3 of the 600,000 yd3 required to grade Cell 1 to the configuration shown in <br />Exhibit F. The remaining 335,000 yd3 will come from approximately 4.5 ft of <br />sediment from the bottom of the existing pond in Cell 1 (currently dewatered) and <br />approximately 3 ft of weathered shale at the bottom of the west half Cell 1 <br />(reservoir area). <br />Backfillinq Cell 2 <br />Aside from an initial stockpile required to open up mine areas to be backfilled, <br />reclamation of Cell 2 will occur as direct replacement of overburden from the <br />stripping process. The initial stockpile is expected to be no larger than 150,000 <br />yd . <br />Backfillinq Cell 3 <br />Backfilling of Cell 3 will begin concurrently with mining and following mining of <br />Cell 6. Overburden stripped from Cell 6 will be placed directly into Cell 3. <br />Additional overburden from Cell 4 will be placed directly into Cell 3 prior to mining <br />Cell 4. Cell 3 will be backfilled to approximate historic grade. <br />Backfillinq Cell 6 <br />Backfilling of Cell 6 will begin following mining of Cell 5. Overburden from Cell 5 <br />will be placed directly into Cell 6. Additional backfill will be obtained from excess <br />soil obtained from the reservoir construction project shown on Exhibit C-2, Sheet <br />1 as "Borrow Cell". Cell 6 will be backfilled to approximate historic grade. <br />Backfilling of an area shown on Exhibit F- Reclamation Plan, Sheet 2 will be <br />done during the non-irrigation season (November-March) for the purpose of <br />construction of a pipe that will route a 3 cfs pending water right from west of Cell <br />6 to the Plumb and Dailey Ditch. <br />Design and Construction of 3 cfs Water Right Pipe <br />The Plumb and Dailey Ditch Company has filed for a 3 cfs flow absolute water <br />right on water that flows through Cell 6. This section provides a design and <br />construction specification to route this flow through a pipe. The design criteria for <br />the pipe includes 1) ability to convey 3 cfs, 2) structural integrity sufficient to