Laserfiche WebLink
6.4.5 Exhibit E - Reclamation Plan 7 77"' E I VE D <br />Reclamation Summary 4 2009 <br />The reclamation plan for Cell 1 is to construct an approximate 40-surface acre -;jamation, <br />clay-lined reservoir in the central area with an area of elevated backfill &h'th'e'nd Safety <br />eastern side of the cell. The reclamation plan for Cell 2 is to construct two <br />separate clay-lined ponds, each with approximately 16 acres of surface area. <br />Cells 3, 5, and 6 will be backfilled to approximate historic grade. Cell 4 will be <br />clay-lined to prevent groundwater inflow into the cell and left as a pond with 3:1 <br />slopes. <br />Reclamation of the pits will occur concurrently with mining whenever and <br />wherever possible. The general order of reclamation activities is given in Table <br />6.4.5-1, Reclamation Sequence Summary. <br />Table 6.4.5-1 - Reclamation Sequence Summary <br />Reclamation Activity Reclamation Sequence <br />Backfill areas adjacent to Oil and Gas <br />Structures - 200 ft radius <br />Backfill eastern area of Cell 1 <br />Clay line Cell 1 <br />Backfill lake perimeter of Cell 2A <br />Clay line Cell 2A <br />Backfill Cell 2B <br />Backfill Western Portion of Cell 2C <br />Backfill Cell 3 to approx. historic grade <br />Backfill Cell 5 to approx. historic grade <br />Backfill Cell 6 to approx. historic grade <br />Clay line Cell 4 <br />Surface Soil Replacement <br />Seeding and Fertilizing <br />2 weeks following excavation adjacent <br />to Oil and Gas wells <br />Following Mining of Cell 1 <br />Following backfilling eastern area of <br />Cell 1 <br />During and following Mining of Cell 2A <br />Upon completion of backfilling of Cell <br />2A <br />During and following Mining of Cell 2B <br />During and following Mining of the <br />Eastern Portion of Cell 2C <br />Following mining of Cell 6 and Cell 4 <br />Following mining of Cell 5 <br />Following mining of Cell 6, with <br />material from Borrow Cell (Erie) <br />Following mining and backfill of Cell 4 <br />Following backfilling, clay-liner <br />construction and rough-grading as <br />appropriate to each cell <br />Following final surface soil <br />replacement for each cell <br />RECEIVED <br />MAY 14 2009 <br />and Safety n, <br />??ining