My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-11_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-05-11_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
5/12/2009 12:25:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
5/11/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameclo. <br />Earth $ Environmental <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No Concerns <br />Summary of Planning Items: <br />Work will continue on structural fill placement in the VLF. <br />Process Soil Liner Fill at the South Cresson Clay Processing will continue. <br />Process materials for the VLF at the Arequa Processing area. <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V: <br />CC&V held a Weekly Construction meeting on April 28, 2009. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />Daily safety meetings are performed prior to each shift. These meetings also discuss work areas, <br />procedures, testing requirements, etc with the Ames supervisors. <br />Continue conversations with Ames concerning oversize material (+24") in the VLF structural fill <br />placement. Oversize material was removed from the fill area. <br />AMEC. <br />Derek Witter, P.E., Project Manager: On site Monday to review the project status. <br />Others: None <br />Summary of Incidents/Accidents/Health & Safety Issues: <br />None <br />We trust the information provided clearly represents our findings and observations for the week ending <br />May 2, 2009. <br />Date: May 2, 2009 <br />Stephen G. Rice, CQA Monitor <br />Approved By: / <br />Sheet 4 of 6 <br />Date: 9 <br />VLF Weekly Report WE 05.02.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.