Laserfiche WebLink
amec <br />Earth 8 Environmental <br />ATTACHMENT A <br />2009 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF AND LOB HAUL ROAD <br />Name APR-26 APR-27 APR-28 APR-29 APR-30 MAY-1 MAY-2 <br />Derek Wittwer - - PM - - - - <br />*Steve Marquez - ST ST ST ST - - <br />Joe Hickey - LS LS LS LS LS LS <br />Steve Rice - PR PR PR PR PR - <br />Madison Crouch - LT LT LT LT LT LT <br />*John Wein ardt - - - - - ST ST <br />Tyler Wendlandt - ST ST ST ST ST ST <br />* Night Shift, CQA <br />LEGEND <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />Sheet 5 of 6 <br />VLF Weekly Report WE 05.02.09.D.doc