My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (364)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (364)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:12 PM
Creation date
4/30/2009 2:52:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL VI Appendix 8, G.2 /H - Pan Evaporation Background / Tech. Specs.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
&AC <br />SMITH WILLIAMS CONSULTANTS, INC. <br />SPECIFICATIONS. During construction, the CQA Monitor shall sample and test these soil types to <br />determine if they meet SPECIFICATIONS. The CQA Monitor shall obtain and test soil samples in <br />accordance with American Society for Testing and Material standards ASTM D75 and ASTM D420. All tests <br />shall be performed by the CQA Monitor on-site or in a geotechnical laboratory approved by the <br />CERTIFYING ENGINEER. <br />6.01 CONSTRUCTION TESTING: <br />During construction, the CQA Monitor shall test all earthwork components to verify that the construction is in <br />accordance with the SPECIFICATIONS. Testing shall be performed on all soil used in the construction to <br />confirm the materials meet SPECIFICATIONS. The CQA Monitor shall conduct testing after final placement <br />of the materials. The tests to be performed, and the testing frequency, for each material type are listed in <br />Tables 1 and 2. The testing frequencies specified in Tables 1 and 2 shall be increased when the CQA Monitor <br />determines that construction conditions (such as adverse weather, equipment breakdown, improperly ballasted <br />compactor, excessive lift thickness, improper soil type, improper moisture conditioning and compaction) <br />warrant additional tests. Additional tests will be approved by MANAGER and directed by the CQA Monitor. <br />6.02 CONSTRUCTION MONITORING: <br />The CQA Monitor will monitor and test all earthwork quality assurance components of the construction to <br />verify that the construction is in accordance with the SPECIFICATIONS. The CQA Monitor shall identify <br />inadequate construction methodologies or materials that may adversely impact the performance of the facility <br />being constructed and existing structures. The CQA Monitor will record visual observations throughout the <br />construction process to ensure that the materials are placed to the minimum dimensions as shown on the <br />DRAWINGS. Quality control testing will be performed by the CONTRACTOR. <br />6.02.01 FOUNDATION PREPARATION: <br />The CQA Monitor shall observe and document the foundation preparation including: <br />¦ stripping and excavation activities to ensure that CONTRACTOR places the material in the <br />appropriate stockpile (Structural Fill, Select Structural Fill, Underdrain Fill, Leak Detection <br />Fill, Low Volume Solution Collection Fill, Bedding Fill, Soil Liner Fill, Drain Cover Fill, <br />Fine Shaft Backfill, Pipe Bedding Material and Granular Filter Material), if stockpiling is <br />necessary; <br />¦ stockpiling activities to verify location of stockpile, material type, and dressing; <br />¦ excavations for moisture seeps, unsuitable foundation soil, elevation, and proper drainage; <br />¦ subgrade preparation to confirm that the surface of the subgrade is free of soft, organic, and <br />otherwise deleterious materials (such as debris, branches, vegetation, mud, ice, or frozen <br />materials); and that soil and rock surfaces that contain joints or fractures are adequately filled <br />in accordance with the SPECIFICATIONS; and <br />¦ construction of access roads, drainage control features and erosion control features to verify <br />compliance with the DRAWINGS and SPECIFICATIONS. <br />6.02.02 PLACEMENT OF MATERIALS: <br />During placement of Structural Fill, Select Structural Fill, Coarse Shaft Backfill, Cemented Rockfill, <br />Underdrain Fill, Low Volume Solution Collection Fill, Bedding Fill, Leak Detection Fill, Soil Liner Fill, <br />Section 01400.1 Page 5 of 9 March 14, 2008 <br />Earthworks CQA Plan Revision 0 <br />SAProJecls\1125 COW Phase 5 VLFU - Tech SpecsVuequa\01400.14.doc
The URL can be used to link to this page
Your browser does not support the video tag.