My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (364)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (364)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:12 PM
Creation date
4/30/2009 2:52:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL VI Appendix 8, G.2 /H - Pan Evaporation Background / Tech. Specs.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QAr <br />® SMITH O IAMB CONSULTANTS, INC. <br />This section identifies and describes the meetings to be held during the course of the construction. Meetings <br />shall be held in order to clearly define construction activities and goals in order to facilitate construction. <br />5.01 PRECONSTRUCTION MEETING: <br />MANAGER will hold a preconstruction meeting at the site prior to the start of construction. MANAGER, <br />DESIGN ENGINEER, CERTIFYING ENGINEER, CQA Monitor, CONTRACTOR, and others <br />designated by MANAGER shall attend this meeting. The purpose of this meeting will be to: <br />¦ review the construction DRAWINGS, CQA Plan, and SPECIFICATIONS; <br />¦ define the responsibilities of each party; <br />¦ define lines of communication and authority; <br />¦ review method of documentation, testing procedures, and reporting inspection data; <br />¦ establish testing protocols and procedures for correcting and documenting construction <br />deficiencies; and <br />¦ discuss any changes that may be needed to ensure that construction will be completed in <br />compliance with the design. <br />¦ This meeting will be documented by MANAGER and copies will be distributed to all parties. <br />5.02 PROGRESS MEETINGS: <br />MANAGER will hold a daily progress meeting, either before the start of work or at the completion of work. <br />At a minimum, this meeting will be attended by the CQA Monitor and CONTRACTOR. The purpose of this <br />meeting will be to: <br />¦ review all the previous day's accomplishments and activities; <br />¦ review scheduled work location and activities for the day; <br />• discuss any problems or potential construction problems; and, <br />¦ review test data. <br />5.03 DEFICIENCY MEETINGS: <br />Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a minimum, these <br />meetings will be attended by the CQA Monitor and CONTRACTOR. If the problem relates to a design <br />issue, MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER should also be present. The <br />meeting will be documented by the CQA Monitor. <br />PART 6: EARTHWORKS CONSTRUCTION OUALITY ASSURANCE <br />Construction of the valley leach facility or specified earthworks shall be in accordance with the DRAWINGS <br />and SPECIFICATIONS. A CQA monitoring and testing program shall be implemented by CC&V to ensure <br />construction compliance by the CONTRACTOR. The CQA testing program shall consist of construction <br />testing of materials used in the valley leach facility construction. The types of materials are defined in the <br />Section 01400.1 Page 4 of 9 March 14, 2008 <br />Earthworks CQA Plan Revision 0 <br />SAProjects\1125 CCBV Phase 5 VLF\I - Tech Specs\Arequa\01400.14.doc