QAr <br />® SMITH O IAMB CONSULTANTS, INC. <br />This section identifies and describes the meetings to be held during the course of the construction. Meetings <br />shall be held in order to clearly define construction activities and goals in order to facilitate construction. <br />5.01 PRECONSTRUCTION MEETING: <br />MANAGER will hold a preconstruction meeting at the site prior to the start of construction. MANAGER, <br />DESIGN ENGINEER, CERTIFYING ENGINEER, CQA Monitor, CONTRACTOR, and others <br />designated by MANAGER shall attend this meeting. The purpose of this meeting will be to: <br />¦ review the construction DRAWINGS, CQA Plan, and SPECIFICATIONS; <br />¦ define the responsibilities of each party; <br />¦ define lines of communication and authority; <br />¦ review method of documentation, testing procedures, and reporting inspection data; <br />¦ establish testing protocols and procedures for correcting and documenting construction <br />deficiencies; and <br />¦ discuss any changes that may be needed to ensure that construction will be completed in <br />compliance with the design. <br />¦ This meeting will be documented by MANAGER and copies will be distributed to all parties. <br />5.02 PROGRESS MEETINGS: <br />MANAGER will hold a daily progress meeting, either before the start of work or at the completion of work. <br />At a minimum, this meeting will be attended by the CQA Monitor and CONTRACTOR. The purpose of this <br />meeting will be to: <br />¦ review all the previous day's accomplishments and activities; <br />¦ review scheduled work location and activities for the day; <br />• discuss any problems or potential construction problems; and, <br />¦ review test data. <br />5.03 DEFICIENCY MEETINGS: <br />Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a minimum, these <br />meetings will be attended by the CQA Monitor and CONTRACTOR. If the problem relates to a design <br />issue, MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER should also be present. The <br />meeting will be documented by the CQA Monitor. <br />PART 6: EARTHWORKS CONSTRUCTION OUALITY ASSURANCE <br />Construction of the valley leach facility or specified earthworks shall be in accordance with the DRAWINGS <br />and SPECIFICATIONS. A CQA monitoring and testing program shall be implemented by CC&V to ensure <br />construction compliance by the CONTRACTOR. The CQA testing program shall consist of construction <br />testing of materials used in the valley leach facility construction. The types of materials are defined in the <br />Section 01400.1 Page 4 of 9 March 14, 2008 <br />Earthworks CQA Plan Revision 0 <br />SAProjects\1125 CCBV Phase 5 VLF\I - Tech Specs\Arequa\01400.14.doc