Laserfiche WebLink
E <br />SAC <br />SMITH WILLIAMS CONSULTANTS, INC. <br />Drain Cover Fill, Fine Shaft Backfill, Pipe Bedding Material and Granular Filter Material, the CQA Monitor <br />shall: <br />¦ verify the use of appropriate fills; <br />¦ monitor and document material placement, including soil type, particle size, loose lift <br />thickness, moisture conditioning process, compaction equipment and methods used to attain <br />compaction, including number of passes, uniformity of compaction coverage, compacted lift <br />thickness, bonding of lifts and in-place moisture content and dry density is in compliance <br />with the SPECIFICATIONS; <br />¦ monitor Soil Liner Fill surface preparation to verify that the surface has been proof-rolled, <br />compacted, or handworked so as to be in a condition suitable for geomembrane installation as <br />discussed in Section 02200 of the SPECIFICATIONS; <br />• monitor Bedding Fill placement and surface preparation to verify that the surface is suitable <br />for geomembrane installation as discussed in Section 02200 of the SPECIFICATIONS; <br />¦ monitor the placement of fill to ensure that CONTRACTOR exercises care in the vicinity of <br />pipes and that the underlying geosynthetics are not damaged; <br />¦ monitor and document CONTRACTOR verification of in-place Soil Liner Fill, Bedding Fill, <br />Low Volume Solution Collection Fill and Drain Cover Fill thickness; <br />¦ monitor equipment being used to place Low Volume Solution Collection Fill and Drain <br />Cover Fill to verify that the CONTRACTOR places the material in accordance with the <br />SPECIFICATIONS; <br />• monitor that Low Volume Solution Collection Fill and Drain Cover Fill is pushed uphill for <br />areas in which the slope exceeds 4H:1 V and that the dozer does not perform unacceptable <br />pivot turns; and <br />¦ monitor the fill temperature as identified in Section 02200 of the SPECIFICATIONS. <br />PART 7: DOCUMENTATION <br />Documentation kept by the CQA Monitor shall consist of daily record-keeping, construction problem <br />resolutions, design and SPECIFICATION changes, photographic records of construction, weekly progress <br />reports, chain of custody forms for test sample tracking, and a Construction Certification Report. <br />7.01 DAILY RECORD KEEPING: <br />Daily records kept by the CQA Monitor shall consist of field notes, observation and testing data sheets, <br />summary of the daily meeting with CONTRACTOR, and reporting of construction problems and resolutions. <br />The CQA Monitor shall submit this information on a regular basis to MANAGER for review. <br />7.02 SOILS OBSERVATION AND TESTING FORMS: <br />The CQA Monitor will document soils observations on forms that generally include the following <br />information: <br />¦ date, project name, location, and weather data, including high and low daily temperatures; <br />Sedion 01400.1 Page 6 of 9 March 14, 2008 <br />Earthworks CQA Plan Revision 0 <br />SAProjects\1125 CCBV Phase 5 VLFU -Tech Specs\Arequa\01400.1 A.doc