My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-27_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-04-27_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:21 PM
Creation date
4/28/2009 11:27:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/27/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports- 4/5/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />amec <br />Earth & Environmental <br />3. Sediment Collection Pond <br />Work is complete. <br />C. Waste Rock to Stockpile: <br />1. VLF <br />No work performed during shift. <br />2. VLF, PSSA Haul Road <br />No work performed during shift. <br />3. Sediment Collection Pond <br />Additional rock stockpiled for removal to the Joe Dandy Main Cresson backfill. <br />D. Cut to Fill <br />1. VLF <br />Structural fill has been on going both shifts during the week in the VLF from <br />approximate Stations K10+00 to K5+00 approximately 0 to 150-feet left of centerline. <br />Fill is being hauled from the LOB Delivery Road cut area and from the excavated <br />material from the sediment pond. Benching each subsequent lift to remove any frozen <br />or unsuitable material was conducted using a Cat D-6 dozer while the fill progresses. <br />All fill placed as per method specification outlined in the Project Specifications. Fill <br />temperature checks during the week for project compliance are recorded. A temporary <br />access route completed between stations K5+00 (+/-) to K3+00 (+/-) and approximately <br />50 to 250 feet left of centerline will re route traffic into the mine. <br />2. VLF, PSSA Haul Road <br />Between stations K10+00 (+/-) and K4+50 (+/-), the structural fill is complete. Fill <br />placed by method specification, compacting with a smooth drum vibratory roller. <br />3. Sediment Collection Pond <br />On Monday, Volvo and CAT 777' haul trucks transported cut from the sediment pond <br />to the VLF fill area. Haul trucks are loaded by a Komatsu 800-track excavator. <br />E. Subgrade Preparation <br />1. VLF <br />Scarified and ripped areas south approximately 0 to 200 feet from centerline of the <br />North Crest PSSA Road between stations F10+00 (+/-) and F8+00 (+/-) in preparation <br />for structural fill placement next week. <br />2. Sediment Collection Pond <br />Surveyors have added additional slope stakes to define the limits of the slopes <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />Production of the SLF material located in SGOSA (Squaw Gulch Overburden Storage <br />Area) Dump 5 has resumed on Wednesday with a new plant. <br />The material screening plant located at the AGOSA (Arequa Gulch Overburden Storage <br />Area) northwest of Ames maintenance area for processing construction materials. The <br />Sheet 2 of 8 <br />VLF Weekly Report WE 04.11.09.D
The URL can be used to link to this page
Your browser does not support the video tag.