Allrn% <br />amec <br />Earth 8 Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: April 11, 2009 <br />Project No.: 8420125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 04/05/09 through 04/11/09 <br />Days S M T W T F S <br />Work Shifts - DI D D D D - <br /> - N N N N N - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 25°F to33° F (+/-) High: 38° F to 45°F <br />AMEC; CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES, No weather related delays. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1. EARTHWORKS <br />A. Clear and Grubbing <br />1. VLF <br />Ames continued clearing and grubbing activities earlier in the week, below the East <br />Perimeter Access Road. Pioneer roads are constructed for access. Ames used one CAT <br />345 track excavator to consolidate grubbed material for loading. Work has advanced <br />down slope to from stations A8+00 (+/-) to H4+00 (+/-) and E20+00 (+/-) to E14+00 <br />(+/-). Work has concentrated within the southeast area of the pad. <br />2. VLF, PSSA Haul Road <br />Work is complete from station K10+00 (+/-) to K4+50 (+/-). <br />3. Sediment Collection Pond <br />Work is complete. <br />B. Stripping <br />1. VLF <br />South approximately 50 to 150-feet from centerline of the North Crest PSSA Road <br />between stations F10+00 (+/-) and 178+00 (+/-) topsoil has been stockpiled for future <br />removal. The existing area is stripped of all unsuitable material in preparation for the <br />continuation of the VLF structural fill. <br />2. VLF, PSSA Haul Road <br />Work is complete from station K10+00 (+/-) to K4+50 (+/-). <br />Sheet 1 of 8 <br />VLF Weekly Report WE 04.11.09.1)