Laserfiche WebLink
• the area is less than evaporation and the geologic materials of the diatreme are <br />sufficiently permeable as to preclude impoundment of water unless a barrier to <br />infiltration is purposefully constructed. <br />North Cresson Mine Area Viewshed Conservation Plan <br />In addition to the site-wide reclamation commitments to re-establish wildlife <br />habitat and grazing as the post-mining land use, CC&V is proposing specific <br />additional reclamation activities for the North Cresson Mine area to mitigate <br />impacts to aspen stands that comprise a portion of the view of the mine operations <br />area from the City of Cripple Creek. <br />Following mining in the North Cresson Mining area, the upper portion of the <br />ridge facing the City of Cripple Creek will present a visual contrast of regraded, <br />2.5H:1V mined slopes above mature aspen and Engelmann spruce stands along <br />the lower portion of the ridge. In order to better blend the mined land reclamation <br />with the remaining trees, CC&V will conduct an aspen transplanting program <br />where the reclaimed slopes meet the mature aspen stands, CC&V will excavate <br />mature "pads" of aspen trees from defined areas within the mature stands (at the <br />• contact line) and transplant those "pads" to the reclaimed slopes that will extend <br />the aspen stands into the reclaimed areas in a pattern that will visually break-up <br />the line between aspen stands and reclamation slopes above. This transplanting <br />will be completed with a large front-end loader (992 or equivalent) at the <br />equivalent tree density of approximately 400 mature stems per acre. For <br />reclamation bonding purposes, CC&V has estimated that ten (10) acres of mature <br />aspen transplanting will be needed to extend these aspen stands back into the <br />reclaimed slopes. <br />In addition, several of the mature aspen stands on the ridge below the North <br />Cresson mining are currently transitioning from mature aspen to climax <br />Engelmann spruce stands. Prior to mining in North Cresson, CC&V will remove <br />(thin) the invading Engelmann spruce from these stands, thus prolonging the <br />interim domination of the aspen trees. For reclamation bonding purposes, CC&V <br />proposes to thin the Engelmann spruce from 100 acres of mature aspens in the <br />Cripple Creek view shed below the North Cresson mining areas. <br />CC&V will also transplant an additional five (5) acres (approximately 400 mature <br />stems per acre) along visual and sound barriers that will be constructed prior to <br />• Cripple Creek & Victor Gold Mining Company <br />Cresson Project Mine Life Extension <br />11-7