Laserfiche WebLink
<br />Demo Concrete Footings <br />Footing Demo, 1.5'Thick X 3' Wide DMG, Attach 5, Reclamation Cost <br />Estimate, Climax Mine, Permit No. M-77- <br />493, April 17, 2000 (Adj for Inflation) <br />$2.91 <br />1.00 <br />$2.91 <br />CY <br /> <br />None <br /> <br />None <br />Demo High Concrete Slab, 12" High Concrete Slab Demo, 12" Thick, Wire Mesh Reinforcement 02.41-16.33-0100 $19.00 1.00 $17.88 SF B-21C 90 Ton Hydraulic Crane <br /> 48 hp Backhoe/Loader, 1200 lb Hyd. <br />Demo Asphalt Asphalt Demo, Pavement Removal 3' Thick 02-41.13.17.5010 $4.63 1.00 $4.36 SY B-38 Hammer, 4 cy FEL, Wheel Mounted <br />Demo Conveyor Systems Conveyor System Demo, On-grade Revised FAS Model $60.75 1.00 $57.17 LF None None <br />Demo Conveyor Systems Conveyor System Demo, Elevated Revised FAS Model $75.94 1.00 $71.46 LF None None <br />Demo Concrete Retaining Walls Concrete Retaining Walls Demo, 12" Thick 02-41-16.17-2500, 2600 $23.10 1.00 $21.74 SF B-9 Air Compressor, 250 cfm