Laserfiche WebLink
East/Mayflower Tailings Delivery Line <br />Efficiency Adj. Unit <br />Component Description/Equipment Means No.lSource Unit Pnce at Altitude Price Units Est. Quantity Price antit Price <br />Concrete Demolition Cost <br />Cut and Ca Ends Plu Drill Holes Local Supplier $1,000 1.00 $1,000 Each 2 $2,00( $2,000 <br />Subtotal $2,000 <br />Demolition Total 52,00 Total S2,000 <br />EARTHWORK <br />Excavation Cost <br />Excavate to Expose Pipe Common Earth. Track Hoe, 1.112 CY Bucket, No Trench Box/Dewaterin 31-23.16.13-0130 S3.30 0.95 $3.27 BCY 20.0 65 0 65 <br />Subtotal $65 <br />Backfill Cost $46 <br />Backfill Trench Track Hoe, 2-1/2 CY Bucket, No Trench Box/Dewaterin , 6' to 10' Deep 31-23-1613-5180 $2.30 0.95 $2.28 BCY 20 $46 $26 <br />Compaction Sheepsfoot, 8° Lifts, Common Fill 31-23-23.24.0300 $1.36 0.97 $1.32 BCY 20 $26 Subtotal $72 <br />Earthwork Total $137 Total $137 <br />