Laserfiche WebLink
Unit Costs <br />Costs: Means 2008 Heavy Construction Cost Data (22nd Edition) and Means Building Construction Cost Data (66th Edition), except as otherwise noted. <br />Location Factor 0.941 Glenwood Springs <br /> Efficiency Adj. Unit <br />Category Description Means No. Unit Price at Altitude Price Units Crew Equipment Required <br />Excavating, Bulk, Dozer Open site, 80 HP, 50' haul, sand & gravel 31.23.16.46-2000 $2.36 0.86 $2.58 BCY B-10L 80 hp Dozer <br />Backfill, Structual, D7 Dozer Open site, 300 HP Dozer, 150' push 31-23-23.14-5200 $0.99 0.86 $1.08 LCY B-10M 300 hp Dozer <br />Backfill, Structual, D8 Dozer Open site, 300 HP Dozer, 300' push 31-23.23.14-4000 $1.47 0.94 $1.47 LCY B-10B 200 hp Dozer <br /> 3 cy Track Loader, 25 Ton Hydraulic <br />Demo Steel Buildings Building Demo, Steel, loading, 12 mile round trip, no dumping fee <br />9 02-41-16.13.0020, 31-23.23.20-1054 $0.10 1.00 $0.09 CF B-8, B-34B Crane, 2-12 cy, 400 hp Dump Trucks <br /> 48 hp Backhoe/Loader,1200 lb Hyd. <br />Demo Concrete Floor, 18" Concrete Floor Demo, 18" Thick, Rebar Reinforcement 02-41-13.17.5500 $133.00 1.00 $125.15 CY B-38 Hammer, 4 cy FEL, Wheel Mounted <br /> 48 hp Backhoe/Loader, 1200 lb Hyd. <br />Demo Concrete Floor, 12" Concrete Floor Demo, 12" Thick, Wire Mesh Reinforcement 02.41.13.17.5500 $133.00 1.00 $125.15 CY B-38 Hammer, 4 cy FEL, Wheel Mounted <br /> 48 hp Backhoe/Loader,1200 lb Hyd. <br />Demo Concrete Floor, 12" Concrete Floor Demo, 12" Thick, Rebar Reinforcement 02-41.13.17-5500 $133.00 1.00 $125.15 CY B-38 Hammer, 4 cy FEL, Wheel Mounted <br /> 48 hp Backhoe/Loader,1200 lb Hyd. <br />Demo Concrete Floor, 10" Concrete Floor Demo, 10" Thick, Wire Mesh Reinforcement 02-41-13.17-5500 $133.00 1.00 $125.15 CY B-38 Hammer, 4 cy FEL, Wheel Mounted <br /> 48 hp Backhoe/Loader,1200 lb Hyd. <br />Demo Concrete Floor, 10" Concrete Floor Demo, 10" Thick, Rebar Reinforcement 02-41-13.17.5500 $133.00 1.00 $125.15 CY B-38 Hammer, 4 cy FEL, Wheel Mounted <br /> 48 hp Backhoe/Loader,1200 lb Hyd. <br />Demo Concrete Floor, 30" Concrete Floor Demo, 10" Thick, No Reinforcement 02-41-13.17-5400 $97.00 1.00 $91.28 <br />CY B-38 <br />Hammer, 4 cy FEL, Wheel Mounted <br /> 48 hp Backhoe/Loader, 1200 lb Hyd. <br />Demo Concrete Floor, 8" Concrete Floor Demo, 8" Thick, Wire Mesh Reinforcement 02-41-13.17-5500 $133.00 1.00 $125.15 CY B-38 Hammer, 4 cy FEL, Wheel Mounted <br /> 48 hp Backhoe/Loader,1200 lb Hyd. <br />Demo Concrete Floor, 8" Concrete Floor Demo, 8" Thick, Rebar Reinforcement 02-41.13.17-5500 $133.00 1.00 $125.15 CY B-38 Hammer, 4 cy FEL, Wheel Mounted <br /> 48 hp Backhoe/Loader, 1200 lb Hyd. <br />Demo Concrete Floor, 8" Concrete Floor Demo, 8" Thick, No Reinforcement 02-41-13.17-5400 $97.00 1.00 $91.28 CY B-38 Hammer, 4 cy FEL, Wheel Mounted <br />Demo Concrete Floor, 6" Concrete Floor Demo, 6" Thick, No Reinforcement 02-41-13.17-5200, Adj for No Mesh $9.12 1.00 $8.58 B•38 48 hp Backhoe/Loader, 1200 lb Hyd. <br />4 cy FEL, Wheel Mounted <br />Hammer <br /> SY , <br />Demo Concrete Floor, 6" Concrete Floor Demo, 6" Thick, Wire Mesh Reinforcement 02-41.13.17-5200 $12.50 1.00 $11.76 B-38 48 hp Backhoe/Loader, 1200 lb Hyd. <br />Hammer, 4 cy FEL, Wheel Mounted <br /> SY <br /> <br />Load/Haul/Disposal Concrete Floor <br />Loading, Asphalt/Concrete/Debris, Load, 5 Mile Haul <br />02-41-16.17-4250 <br />$14.85 <br />1.00 <br />$13.97 <br />B-30 1.5 cy Hyd. Excavator, 2-12 cy, 400 hp <br />Dump Trucks <br /> CY <br /> DMG, Attach 5, Reclamation Cost <br />Demo Concrete Footings Footing Demo, 1' Thick X 2' Wide Estimate, Climax Mine, Permit No. M-77- $2.91 1.00 $2.91 CY <br /> 493, April 17, 2000 (Adj for Inflation) None None <br /> DMG, Attach 5, Reclamation Cost <br />Demo Concrete Footings Footing Demo, 2' Thick X 3' Wide Estimate, Climax Mine, Permit No. M-77- $2.91 1.00 $2.91 CY <br /> 493, April 17, 2000 (Adj for Inflation) None None <br /> DMG, Attach 5, Reclamation Cost <br />Demo Concrete Footings Footing Demo, 1.5'Thick X 2' Wide Estimate, Climax Mine, Permit No. M-77- $2.91 1.00 $2.91 CY <br /> 493, April 17, 2000 (Adj for Inflation) None None