My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-21_GENERAL DOCUMENTS - C1981033
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981033
>
2009-04-21_GENERAL DOCUMENTS - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:45 PM
Creation date
4/21/2009 3:39:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
4/21/2009
Doc Name
Preliminary Submittal Adequacy Review & Cost Estimate
From
Susan Burgmaier
To
Joe Dudash
Permit Index Doc Type
General Correspondence
Email Name
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />Task # : 07b State : Colorado <br />Date : 0411512009 County :Gunnison <br />User : SLB Site : Bear No. 3 <br />Agency or organization name : CDRMS <br />Permit or other job action : Phase I Bond Release <br />Task description : Rip/scarify replaced topsoil <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D3G XL -3P <br />Blade type :Power Angle Tilt <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 70 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $12.77 NA <br />Dozer operating cost/hour : $21.62 100 <br />Ripper operating cost/hour : $1.99 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $69.16 Total fleet cost/hour : $69.16 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA <br />Area : 7.28 <br />NA <br />acres <br />Load factor : NA Bank volume <br />Rip depth (ft) : 1.00 Volume <br />NA <br />11,745 <br />BC:Y <br />BC:Y or CCY <br />Source of estimated quantity :Division Estimate <br />Source of estimated load factor : NA <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity: NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 814.28 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 1.00 feet/pass Site altitude : 6,000 feet <br />Average ripping width : 5.08 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 100.00 feet/pass Job efficiency factor : 0.83 (1 shif 1day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.505 acres/hour Adjusted unit production : 675.85 cu. yds./hour <br />Unadjusted production : 814.28 cu. yds./hour Adjusted fleet production : 675.85 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) Total job time : 17.38 hours <br />Unit cost : $0.102 per cu. yd. Total job cost : $1,202 <br /> <br />Permit/job # : C-1981-033 <br />Abbreviation :none <br />Filename : C033-07b
The URL can be used to link to this page
Your browser does not support the video tag.