My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-21_GENERAL DOCUMENTS - C1981033
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981033
>
2009-04-21_GENERAL DOCUMENTS - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:45 PM
Creation date
4/21/2009 3:39:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
4/21/2009
Doc Name
Preliminary Submittal Adequacy Review & Cost Estimate
From
Susan Burgmaier
To
Joe Dudash
Permit Index Doc Type
General Correspondence
Email Name
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task #: 007 <br />Date : 0411512009 <br />User: SLB <br />Permit/job# C-1981-033 <br />Abbreviation :none <br />Filename : C033-007 <br />Agency or organization name : CDRMS <br />Permit or other job action :Phase I Bond Release <br />Task description : Redistribute topsoil over facilities area <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series lI - 7SU <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $48.36 NA <br />Operating cost/hour : $56.19 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $137.33 Total fleet cost/hour <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,000 CCY factor : 1.125 volume : 5,625 <br />$137.33 <br />LCY <br />Source of estimated volume : Permit application Volume /, p. 2.05-23R <br />Source of estimated swell factor :Division estimate <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 300 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 311.1 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 0.60 (fnd-so <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2550 Ibs/LCY Net correction : 0.34 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 104.77 LCY/hr <br /> Adjusted fleet production : 104.77 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 53.69 Hours <br />Unit cost : $1.311 /LCY Total job cost : $7,373 <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County :Gunnison <br />Site : Bear No. 3 <br />Horsepower <br />94n <br />Shiftbasis : 1 per day <br />Data source : (CRG)
The URL can be used to link to this page
Your browser does not support the video tag.