Laserfiche WebLink
DEMOLITION WORK <br />TASK # 008 Bear No. 3 Mine C-1981-033 April 17, 2009 <br />Phase I Release <br />STRUCTURE OR ITEM DESCRIPTION DIMENSIONS DEMOLITION DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST <br />Chain link fence 920 fin. Ft. Means 02 41 13.60 1700 920 LF $2.50 $2,300.00 <br />Gates 20' opening Means 02 41 13.62 0400 1 EA $111.50 $111.50 <br />Disposal NA Means 02 41 13.33 4450 20 CY $7.18 $143.60 <br /> <br />Culvert 5 - inlet to sediment pond 18" x 50' Means 02 41 13.40 0160 50 LF $2.87 $143.50 <br />- excavation/backfill of culvert Division estimate 50 LF $0.25 $12.50 <br />Outlet pipes for treatment pond 2 - 6" x 175' Means 02 41 13.40 0100 350 LF $1.43 $500.50 <br />Inlet pipe for treatment pond 12" x 150' Means 02 41 13.40 0150 150 LF $1.92 $288.00 <br />- excavation/backfill of culvert Division estimate 150 LF $0.25 $37.50 <br />Outlet pipe for sediment pond 12" x 40' Means 02 41 13.40 0150 40 LF $1.92 $76.80 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotal $3,613.90 <br />City Cost Index = 105.7% $205.99 <br />Task Total $3,819.89 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />