My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-13_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-04-13_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:30 PM
Creation date
4/15/2009 2:14:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/13/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports-3/15/09 & 3/22/09.
From
CC&V
To
DRMS
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />Earth & Environmental <br />Summarv of SLF Drocessiniz <br />Location This Week Cumulative Comments <br /> (tons) (tons) <br />SGOSA Dump 5 Clay 3,001 23,600 No production this week <br />Processing <br />Totals 3,001 23,600 No Change this week. <br />G. Miscellaneous <br />None <br />II. Underground Workings <br />A. Drilling <br />At conveyor transfer stations 4 and 5, Rockbreakers has completed the conformation <br />drilling for the existing underground workings. The drilling work was on going for 2-days. <br />B. Mine Shaft/Stope Remediation <br />Some of the underground workings identified in Figure 1, Revision A, will be remediated <br />as a result of them being removed due to excavation to final grade. All underground <br />workings, whether requiring remediation or not as determined by engineering, will be <br />checked and verified in the field during construction activities. This is on going as the <br />work progresses. Additional areas have been found by Ames during construction and the <br />information has been forwarded to AMEC and CC&V. Field observations of the areas <br />during the week, where accessible, have been either backfilled or removed during the <br />excavation of the LOB Delivery Road. <br />A site visit on Monday, to evaluate the existing underground workings within the conveyor <br />alignment was conducted by John Lupo, P.E. (AMEC). Findings and remedial <br />recommendations were forwarded to AMEC and CC&V on Friday. <br />Lateral/Slot Remediation <br />No work performed this week. <br />III. Stormwater Management Structures <br />A. LOB Stormwater Culverts <br />No work performed this week. <br />B. Roadside ditch <br />No work performed this week. <br />C. Best Management Practices (BMP) <br />No work performed this week. Existing silt fencing structures appear to be in good <br />condition. <br />Sheet 3 of 11 LOB Weekly Report WE 03.21.09.D
The URL can be used to link to this page
Your browser does not support the video tag.