Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 067 State :Colorado Permitrob # : C-1980-004 <br />Date : 0312912009 County:Garfield Abbreviation :none <br />User : JRS Site :Mcclane Canyon Mine Filename :0004-067 <br />Permit or other job action :2009 Midterm Review <br />Task description :Mobilize/Demobilize Equipment for Site Maintenance <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />Available rig capacities : 0-25 Tons 26-50 Tonsµ 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Costlhour l $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description _ <br />-Cat D3G LGP - 3P <br /> Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hrlunit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />; Co <br />st/flee <br />t <br /> 9.69 $11.79 $88.67 10 $1,004,63 $886.70 _ <br />_ <br />_ $0.00 <br /> <br /> <br /> <br /> <br /> <br /> { <br /> i <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $1,004.63 $886.70 J ? $0.00