Laserfiche WebLink
ROADABLE EQUIPMENT <br />Machine <br />Description <br />EQUIPMENT HAUL DISTANCE and TIME <br />sheet 2 of 2 <br /> Nearest major city or town within project area region : Grand Junction <br />Transportation Cycle Time: Non- Total one-wa <br />travel dista 40 <br />0 <br /> y <br />nce : . <br />miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.89 0.89 Total non-roadable mob/demob cost $9,390.11 <br />Return time (hours) = 0.89 0.89 ` two round trips with haul rig <br />Loading time (hours) = 1.50 NA Total roadable mob/demob cost ** : $0.00 <br />Unloading time (hours) = 1.50 NA •` one round trip, no haul rig <br />Subtotals = 4.78 1.78 <br />JOB TIME AND COST Total job time : 9.55 hours <br />Total job cost : $9,390