Laserfiche WebLink
ROADABLE EQUIPMENT <br />Machine Total <br />Description ;Cost/houri <br />-Flatbed Truck, 6x4, 45K GVW $82.02 <br />Fleet Size Haul Trip Return Trip <br />(No. units) Cost/hr/fleet Cost/hr/fleet <br />1 $82.02 $82.02 <br />Subtotals :1 $82.02 $82.02 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest m ajor city or town within project area region : Grand Junction <br />Transportation Cycle Time: Non- Total one-wa <br />travel di <br />t 40 <br /> y <br />s <br />ance : .0 <br /> Roadable Roadable Average travel speed : 45.0 <br /> Equipment Equipment <br />Haul time (hours) = 0.89 0.89 Total non-roadable mob/demob cost $2,365.31 <br />Return time (hours) = 0.89 0.89 ' two round trips with haul rig <br />Loading time (hours) = 0.25 NA Total roadable mob/demob cost ** $145.81 <br />Unloading time (hours) = 0.25 NA •• one round trip, no haul rig <br />Subtotals = 2.28 1.78 <br /> <br />JOB T <br />sheet 2 of 2 <br />miles <br />mph <br />IME AND COST Total job time : 4.56 hours <br />Total job cost : $Z511