Laserfiche WebLink
8 will receive topsoil from stockpiles. All other mining areas will receive topsoil directly from <br />surrounding mining areas. <br />3. Haul Roads and Access <br />The access road will head south from the facilities area where it will intersect with Highway 160 <br />This access road will not be reclaimed at the end of mining to allow access through the site. The <br />access road will be a graveled road approximately 24 feet wide. <br />Accel/decel lanes at the intersection of Highway 160 and the access road are needed on this site <br />as part of the CDOT Access Permit. The Accel/decel will remain after mining. <br />4. Reclamation Timetable <br />The timetable for reclamation is shown below in Table E-2. Reclamation Timetable Exhibit L: <br />Reclamation Costs describes the worst case bond scenario. <br />Simmons Pit, March 2009 E-2