Laserfiche WebLink
J&T Consulting, Inc. GP Ranches LI <br />West Farm <br />lamation Bond Quantities and Costs <br />07115 GP Ranches Rec Bond <br />Phase 7 (9.35 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Liner Required to Close Phases 4,6 (Credit) - Shell (236,997) cyd $ 2.25 $ (533,244) <br />Liner Required to Close Phases 4,6 (Credit) - Core (86,579) cyd $ 3.25 $ (281,383) <br />Permanent liner - Shell 85,238 cyd $ 2.25 $ 191,786 <br />Permanent liner - Core 31,586 cyd $ 3.25 $ 102,654 <br />Liner Required to Close Phase 7 - Shell 145,375 cyd $ 2.25 $ 327,095 <br />Liner Required to Close Phase 7 - Core 53,870 cyd $ 3.25 $ 175,078 <br />Topsoil Area Above Water 1.8 ac $ 2,000 $ 3,645 <br />Revegetate Area Above Water 1.8 ac $ 1,000 $ 1,822 <br />Dewatering of Full Pit 155.8 Mil. Gal. $ 350.00 $ 54,524 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Di rect Cost $ 44,477 <br />Overhead and Profit Cost (12.60%) $ 5,604 <br />Contract Cost $ 50,082 <br />Project Management (9.25%) $ 4,114 <br />Additional Financial Warrant Required For Phase 7 $ 54,196 <br />Phase S (9.59 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Liner Required to Close Phase 5 (Credit) - Shell (158,514) cyd $ 2.25 $ (356,656) <br />Liner Required to Close Phase 5 (Credit) - Core (56,310) cyd $ 3.25 $ (183,007) <br />Permanent liner- Shell 93,779 cyd $ 2.25 $ 211,004 <br />Permanent liner - Core 33,314 cyd $ 3.25 $ 108,270 <br />Liner Required to Close Phase 8 - Shell 253,812 cyd $ 2.25 $ 571,077 <br />Liner Required to Close Phase 8 - Core 90,163 cyd $ 3.25 $ 293,031 <br />Topsoil Area Above Water 2.5 ac $ 2,000 $ 5,044 <br />Revegetate Area Above Water 2.5 ac $ 1,000 $ 2,522 <br />Dewatering of Full Pit 147.6 Mil. Gal. $ 350.00 $ 51,663 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 1,245,111 <br />Overhead and Profit Cost (12.60%) $ 156,884 <br />Contract Cost $ 1,401,995 <br />Project Management (9.25%) $ 115,173 <br />Additional Financial Warrant Required For Phase 8 $ 1,517,16871 <br />5