My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-19_PERMIT FILE - M2008078 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008078
>
2009-03-19_PERMIT FILE - M2008078 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:34 PM
Creation date
3/23/2009 2:42:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
PERMIT FILE
Doc Date
3/19/2009
Doc Name
Adequacy Review 02 Response
From
J&T Consulting, Inc.
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&T Consulting, Inc. GP Ranches LI <br />West Farm <br />3/19/21 <br />Bond Quantities and Costs <br />07115 GP Ranches Rec Bond <br />Phase 9 (9.60 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Liner Required to Close Phases 8,6 (Credit) - Shell (254,571) cyd $ 2.25 $ (572,786) <br />Liner Required to Close Phases 8,6 (Credit) - Core (90,433) cyd $ 3.25 $ (293,907) <br />Liner Required to Close Phase 9 - Shell 233,751 cyd $ 2.25 $ 525,940 <br />Liner Required to Close Phase 9 - Core 86,619 cyd $ 3.25 $ 281,511 <br />Topsoil Area Above Water 1.8 cyd $ 2.25 $ 4 <br />Revegetate Area Above Water 1.8 cyd $ 3.25 $ 6 <br />Dewatering of Full Pit 160.2 Mil. Gal. $ 350.00 $ 56,057 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Di rect Cost $ (675) <br />Overhead and Profit Cost (12.60%) $ (85) <br />Contract Cost $ (760) <br />Project Management (9.25%) $ (62) <br />Additional Financial Warrant Required For Phase 9 $ 822 <br />Phase 10 (9.50 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Liner Required to Close Phases 7,9 (Credit) - Shell (231,485) cyd $ 2.25 $ (520,842) <br />Liner Required to Close Phases 7,9 (Credit) - Core (85,779) cyd $ 3.25 $ (278,782) <br />Permanent liner - Shell 86,110 cyd $ 2.25 $ 193,747 <br />Permanent liner - Core 31,909 cyd $ 3.25 $ 103,703 <br />Liner Required to Close Phase 10 - Shell 146,944 cyd $ 2.25 $ 330,625 <br />Liner Required to Close Phase 10 - Core 54,452 cyd $ 3.25 $ 176,968 <br />Topsoil Area Above Water 1.8 ac $ 2,000 $ 3,683 <br />Revegetate Area Above Water 1.8 ac $ 1,000 $ 1,842 <br />Dewatering of Full Pit 158.5 Mil. Gal. $ 350.00 $ 55,486 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Di rect Cost $ 68,930 <br />Overhead and Profit Cost (12.60%) $ 8,685 <br />Contract Cost $ 77,615 <br />Project Management (9.25%) $ 6,376 <br />Additional Financial Warrant Required For Phase 10 $ 83,991 <br />6of10
The URL can be used to link to this page
Your browser does not support the video tag.