My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-19_PERMIT FILE - M2008078 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008078
>
2009-03-19_PERMIT FILE - M2008078 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:34 PM
Creation date
3/23/2009 2:42:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
PERMIT FILE
Doc Date
3/19/2009
Doc Name
Adequacy Review 02 Response
From
J&T Consulting, Inc.
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&T Consulting, Inc. GP Ranches LI <br />West Farm <br />3/19/21 <br />lamation Bond Quantities and Costs <br />07115 GP Ranches Rec Bond <br />Phase 5 (9.32 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Liner Required to Close Phases 2 (Credit) - Shell (173,321) cyd $ 2.25 $ (389,973) <br />Liner Required to Close Phases 2 (Credit) - Core (61,570) cyd $ 3.25 $ (200,103) <br />Permanent liner - Shell 65,304 cyd $ 2.25 $ 146,934 <br />Permanent liner- Core 23,198 cyd $ 3.25 $ 75,395 <br />Liner Required to Close Phase 5 - Shell 251,344 cyd $ 2.25 $ 565,525 <br />Liner Required to Close Phase 5 - Core 89,287 cyd $ 3.25 $ 290,182 <br />Topsoil Area Above Water 2.3 ac $ 2,000 $ 4,595 <br />Revegetate Area Above Water 2.3 ac $ 1,000 $ 2,298 <br />Dewatering of Full Pit 143.2 Mil. Gal. $ 350.00 $ 50,115 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br />Total Direct Cost $ 1,137,543 <br />Overhead and Profit Cost (12.60%) $ 315 <br />Contract Cost $ 2,815 <br />Project Management (9.25%) $ 231 <br />Additional Financial Warrant Required For Phase 5 $ 3,046 <br />Phase 6 (9.50 acres) <br />Liner Required to Close Phases 3,5 (Credit) - Shell (246,576) cyd $ 2.25 $ (554,796) <br />Liner Required to Close Phases 3,5 (Credit) - Core (88,829) cyd $ 3.25 $ (288,695) <br />Liner Required to Close Phase 6 - Shell 239,688 cyd $ 2.25 $ 539,299 <br />Liner Required to Close Phase 6 - Core 87,562 cyd $ 3.25 $ 284,578 <br />Topsoil Area Above Water 1.8 cyd $ 2.25 $ 4 <br />Revegetate Area Above Water 1.8 cyd $ 3.25 $ 6 <br />Dewatering of Full Pit 158.4 ac $ 350.00 $ 55,448 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br />Total Direct Cost $ 38,344 <br />Overhead and Profit Cost (12.60%) $ 4,831 <br />Contract Cost $ 43,175 <br />Project Management (9.25%) $ 3,547 <br />Additional Financial Warrant Required For Phase 6 $ 46, 722 <br />4of10
The URL can be used to link to this page
Your browser does not support the video tag.