ame <br />Earth 8 Environmental <br />2. LOB/delivery Road <br />• Removal of cut from Station 35+00 advancing down station to 16+00(+/-). <br />All excavated rock this week has been hauled to Dump 4 using 3 Cat 777 <br />Haul Trucks a Komatsu 800 excavator aided by a Cat D-10 dozer. <br />• Ames has been hauling waste rock to Dump 4 <br />• Rockbreakers continue drilling the LOB/Delivery Road cut from Station <br />26+00 to Station 30+00 for the planned blasting. <br />D. Cut to Fill <br />1. LOB Pad <br />• No Activities, site was shot on Thursday <br />2. LOB/Delivery Road <br />• No fill was placed this week. Fill placement tentative start on Monday <br />March 9, 2009 between Stations 34+00 to 40+00(+/-). Approximately 12 to <br />15 feet remain at the maximum fill section. <br />• Night work consisted of cut from Station 2+00 to approximately 4+00 and <br />fill to VLF Station K4+00 to K8+00, 0- to 100-feet left. <br />E. Subgrade Preparation <br />1. LOB Pad <br />• No Activities <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />1. The SLF clay plant was down most of the week with limited production. <br />Summary of SLF nrocessing <br />Location This Week <br />tons Cumulative <br />tons Comments <br />LOB Plant, Dump 5 Clay 090 <br />3 20 <br />599 Plant ran at limited production this <br />Processing , , week. Down 2 days. <br />Totals 3,090 20,599 <br />F <br />G. Miscellaneous <br />1. Fill placement and access for power pole re-location is on going. Sites are <br />outside the immediate LOB/Delivery Road work areas. <br />II. Underground Working <br />A. Drilling <br />• No drilling this week. <br />Sheet 2 of 9 <br />LOB Weekly Report WE 03.07.09.D.doc