Laserfiche WebLink
BEAR COAL COMPANY, INC. <br />RECLAMATION BOND SUMMARY <br />PERMIT C-1981-033 <br />February 1, 2007 Estimate <br /> Remaing <br /> Original Bond Phase I Bond <br />001 Regrade Facilities Area $7,208 $0 <br />002 Backfill and Regrade Portal Bench and Access Road 44% $3,375 $1,485 <br />003 Regrade Water Treatment Pond $1,287 $1,287 <br />004 Rip Portal Bench, Access Road and Facilities Area 44% $2,037 $896 <br />005 Regrade Ditches and Flood Control Dike $180 $180 <br />006 Regrade Sediment Pond $2,331 $2,331 <br />007 Redistribute Topsoil over Facilities Area $7,226 $7,226 <br />07b Rip Topsoil $1,181 $1,181 <br /> 749 <br />$100 $0 <br />008 Demolition , <br />08b Demolish Culverts - Culvert 1 - 4 Demolished $4,118 $3,128 <br />009 Seal Portals $28,249 $0 <br />011 Drill Seed $7,639 $7,639 <br />012 Broadcast Seed $16,463 $16,463 <br />013 Plant Tublings $2,135 $2,135 <br />014 Mobilze Equipment $11,772 $5,886 <br />14b Mobilize Equipment for Maintenance $11,775 $11,775 <br /> 485 <br />$3 485 <br />$3 <br />016 Weed Control Over Liabilit Period , , <br /> 718 <br />$2 718 <br />$2 <br />017 Rill and Gull Repair , <br />041 <br />$2 , <br />041 <br />$2 <br /> ll <br />l W <br />i , , <br />018 s <br />e <br />a <br />Seal Alluv 765 <br />$1 765 <br />$1 <br />021 Fence and Gate Demolotion , , <br /> <br /> Total Direct Cost $217,734 <br /> 445 <br />$217 621 <br />$71 <br /> Total Direct Cost (DRMS) , , <br /> <br /> Liabilit Insurance $4,392 <br />283 <br />$2 $1,447 <br />$752 <br /> Performance Bond , <br /> Job Superintendent $7,399 $3,700 <br /> 745 <br />$21 162 <br />$7 <br /> Profit , , <br /> <br /> 819 <br />5 060 <br />$13 <br /> Total Overhead and Profit , <br />$3 , <br /> <br /> Contract Amount $253,264 $84,682 <br /> <br /> Engineering Work 4.25% Contract Amount $10,764 $3,599 <br /> 196 <br />$15 081 <br />$5 <br /> Reclamation Management 6% of Contract Amount , , <br /> <br /> Total Indirect $61,779 $21,740 <br /> <br /> Total Bond Amount $279,224 $93,362