BEAR COAL COMPANY, INC. <br />RECLAMATION BOND SUMMARY <br />PERMIT C-1981-033 <br />August 21, 2003 Estimate <br /> Remaining <br /> Original Bond Phase I Bond <br />001 Regrade Facilities Area $6,552 $0 <br />002 Backfill and Regrade Portal Bench and Access Road 44% $5,228 $2,300 <br />006 Rip Portal Bench, Access Road and Facilities Area 44% $1,952 $859 <br />008 Regrade Facilities Area Collection Ditches $26 $26 <br />009 Regrade Sediment Pond $463 $463 <br />011 Replace Topsoil from Stockpile to Facilities Area $5,930 $5,930 <br />013 Seal Three Mine Entries $6,391 $0 <br />015 Demolish and Remove All Structures $78,518 $0 <br />017 Reseed Facilities Area $8,687 $8,687 <br />019 Plant Tublings in Riparian Area $3,809 $3,809 <br />021 Mobilize/Demobilize Equipment for Reclamation $3,815 $1,908 <br /> <br /> <br /> Total Direct Cost $121,371 $23,982 <br /> <br /> Liability Insurance $1,881 $372 <br /> Performance Bond $1,274 $252 <br /> Job Superintendent $7,980 $3,990 <br /> Profit $12,137 $2,398 <br /> <br /> Total Overhead and Profit $23,273 $7,012 <br /> <br /> Contract Amount $144,644 $30,993 <br /> <br /> Engineering Work 4.25% Contract Amount <br />Reclamation Management 6% of Contract Amount $6,147.36 <br />$8,678.62 $1,317.22 <br />$1,859.60 <br /> <br /> Total Indirect $14,825.98 $3,176.82 <br /> <br /> Total Bond Amount $159,470 $34,170