My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-11-10_REVISION - M1978056 (13)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978056
>
2003-11-10_REVISION - M1978056 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:15:25 PM
Creation date
3/12/2009 1:37:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978056
IBM Index Class Name
Revision
Doc Date
11/10/2003
Doc Name
Section G to Exhibit R
From
Varra Companies, Inc.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit L - Reclamation Costs <br />Soil Demand AND Re-soiling of Affected Lands (refer to Exhibit L - <br />Addendum B: Durham Stockpile Measurements: <br />Current Soil Demand over the permitted lands is determined as follows: <br />'Total Affected Lands 2003: <br />22.14± acres Affected Lands not otherwise described on Exhibit C - Map <br />- 8.68± acres Replaced soil on finished slopes above existing and anticipated <br />water level in Tracts C and A <br />13.46± acres Total of Affected Lands not otherwise described <br />45.75± acres Planned Extraction on Tracts A and C <br />59.21± acres Sub-Total <br />13.46± acres Reserve of Soil for Fill of Tract D <br />72.67± acres Total Acres. <br />x 0.5 feet (6.0± inches) depth of soil replacement _ 27 cu. ft. per cu. yd. <br />58,620.5 cu.yds. Total Soil Demand to re-soil affected lands. <br />NOTE: The soil demand (and related costs) will decrease proportionately as <br />extraction activities increase over each Tract of planned extraction. <br />Based upon estimated soil resources in stockpile, and a minor amount in-situ in <br />Tract B, there is presently an excess of 25,215 cu..yds. of soil available for <br />reclamation. This is the amount presently available for sale from existing <br />stockpiles. The balance will be reserved until liberated by continued extraction <br />activities over the Tracts, since obviously soil will not be needed for locations <br />below anticipated water levels. Additional soil resources will be liberated on a <br />percent basis of the area fill of Tract D. <br />The majority of soil placement can occur using the five remaining stockpiles with <br />an average placement distance of 600 ft. utilizing a Cat 637E. Since there is some <br />swell, the volume of stockpiled soil is multiplied by a swell fact or 1.33 to this <br />effect: <br />58,620.5 cu.yds. of soil demand <br />x 1.33 <br />77,964.6 L.cu.yds. <br />x $0.413 per L.cu.yd. <br />Varra Companies, Inc. DMG Permit M78-056 Amendment of August 2003 11 <br />Durham - Resource Recovery and Land Development Project
The URL can be used to link to this page
Your browser does not support the video tag.