My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-11-10_REVISION - M1978056 (13)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978056
>
2003-11-10_REVISION - M1978056 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:15:25 PM
Creation date
3/12/2009 1:37:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978056
IBM Index Class Name
Revision
Doc Date
11/10/2003
Doc Name
Section G to Exhibit R
From
Varra Companies, Inc.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit L - Reclamation Costs <br />Total Affected Lands: <br />22.14± acres Affected Lands not otherwise described on Exhibit C - Map <br />- 8.68± acres Replaced soil on finished slopes above existing and anticipated <br />water level in Tracts C and A <br />13.46± acres Total of Affected Lands not otherwise described <br />45.75± acres Planned Extraction on Tracts A and C <br />59.21± acres <br />x.33% of total compacted lands <br />19.54± Acres of Compacted land to Rip. <br />x 43560 sq. ft. per acre <br />851,162.40± cu. ft. <br />27 cu. ft. per cu. yd. <br />31,524.53± cu. yds. <br />x $ 0.133± per cu. yd. <br />$ 4,192.76± to rip 33% of current total of affected lands. <br />SUMMARY OF SITE PREPARATION COSTS: <br />The swell factor used by the Division of 1.33 percent will be applied to the final <br />costs of grading to the same affect as the influence on volume in this manner. <br />Since the Graphic Volume chart is based upon lose volume, and since the above <br />ground portion (cut) are not loose, and will increase the volume of fill necessary by <br />the expansion of the cut area for fill, .i.e., the extracted ground will create 1.33 <br />percent more fill from the cut, therefore, the values derived for locations receiving <br />fill from a cut will be reduced by 50% of the 1.33 percent factor, or a factor of <br />1.165 in consideration of the actual cost of fill. Therefore, the total costs for <br />dewatering, grading and ripping are as follows; <br />$ 71172.66± Dewatering <br />$ 55911.64± Grading Tract D <br />$ 2,867.72± Grading NORTHBANK - Tract C <br />$ 21,163.83± Grading WESTBANK - Tract C <br />$ 12,525.90± Grading SOUTHBANK - Tract C <br />$ 11510.09± Grading 800' Advancing Pit Wall <br />$ 45192.76± Ripping - 33% of balance of affected lands <br />$ 259071.60± Total Site Preparation Prior to Re-soiling. <br />Varra Companies, Inc. DMG Permit M78-056 Amendment of August 2003 10 <br />Durham - Resource Recovery and Land Development Project
The URL can be used to link to this page
Your browser does not support the video tag.