Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task # : 002 State : Colorado <br />Date : 0211912003 County: Park <br />User : JD1 Site: Chaparral Meadows Pit <br />Permit or other job action : Final Reclamation <br />Task description :replace topsoil <br />HOURLY EQUIPMENT COST <br />Cost Bre <br />Permit/job #: M-1984-101 <br />Abbreviation : none <br />Filename : M101-002 <br />Shift basis : . 1 per day <br />Description <br />Scraper work team -Scraper : Cat 637G <br />-Push dozer : NA <br />Support equipment -Load area : NA _ <br />-Dump area : M4 <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $75.69 NA NA NA NA NA <br />Operating cost/hour: $149.02 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $25.43 NA NA NA NA NA <br />Unit subtotals : $250.14 NA NA NA NA NA <br />Number of units : 1 0 0 0 0 0 <br />Group subtotals : Work : $250.14 Support: $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $250.14 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 53,350 LCY factor <br />Source of quantity take-off : calculation <br />Source of estimated swell factor : NA <br />Loose <br />NA volume : 53,350 <br />LCY