My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-13_GENERAL DOCUMENTS - M1984101 (7)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1984101
>
2009-01-13_GENERAL DOCUMENTS - M1984101 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:52 PM
Creation date
3/11/2009 9:10:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984101
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
1/13/2009
Doc Name
Referral Response- Add. A
From
Park County
To
DRMS
Permit Index Doc Type
Gen. Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinq Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 001 State : Colorado Permit/jjob# : M-1984-101 <br />Date : 0211912003 County : Park Abbreviation : none _ <br />User : JD1 Site : Chaparral Meadows Pit Filename : M101-001 <br />Agency or organization name : DMG <br />Permit or other job action : final reclamation _ <br />Task description : grade high walls to 3:1 <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series ll - 8U Horsepower : 310 <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 42,500 <br />Blade type : Universal <br />Attachment no.1 : ROPS Cab Shift basis:- 1 per day <br />Attachment no. 2: NA <br /> Data source: (CRG) <br /> - <br />Utilization % <br />Ownership cost/hour : $44.49 NA <br />Operating cost/hour : $61.72 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator costihour : $24.01 NA <br />Total unit cost/hour : $130.22 Total fleet cost/hour : $130.22. <br /> <br />Swell " Loose <br />CCY factor: 1.125 volume: 47,812 LCY <br />Source of estimated volume : calculation <br />Source of estimated swell factor : program <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly -production : 1,627.0 LCY/hr <br />Material consistency description : <br />Consolidated stockpile <br />Average push gradient : 5.00 % (neg) <br />Average site altitude : 8,740 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost : $0.111 /LCY <br />Job Condition Correction Factors Source <br />Operator skill : 0.75 (a vg-) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.20 (slot) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (1.shift1day) <br />Spoil pile : 1.00 (doz-oc) <br />Push gradient : 1.11 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : a87 (Cat HB) <br />Blade type : 1.00 S/SU/U) <br />Net correction : a 72 <br />Adjusted unit production : 1176.16 LCY/hr <br />Adjusted fleet production : 1,176.16 LCY/hr <br />Total job time : 40.65 Hours <br />Total job cost : $5,294
The URL can be used to link to this page
Your browser does not support the video tag.