Ar?k <br />a.amedlw <br />Earth & Environmental <br />• Ames continued setup of a materials screening plant to process construction <br />materials. Setup was completed by the end of the week. Start-up of the material <br />processing plant commenced on Friday for the production of 5-required <br />materials. The plant is located at "Arequa Process Area" northwest of Ames <br />maintenance area. <br />Summarv of SLF nrocessing <br />Location This Week <br />(tons) Cumulative <br />(tons) Comments <br /> A total of 11 samples of process <br />LOB Plant (Dump 5) 5,510 17,509 and non processed clay were taken <br /> for testing. Tests are in progress. <br />Totals 5,510 17,509 <br />G. Miscellaneous <br />• No Activities <br />II. Underground Working <br />A. Drilling <br />• Rockbreakers have completed drilling within the planned sediment collection pond area <br />• Drilling was completed in the vicinity of the Thompson and Kitty Lane shafts, adjacent <br />to the electrical sub-station. <br />• One rig still down for repairs. <br />B. Mine Shaft/Stope Remediation <br />• No Activities <br />C. Lateral/Slot Remediation <br />• No Activities <br />III. Stormwater Management Structures <br />A. Control Structures <br />• No Activities <br />IV. VLF Geosynthetics <br />A. LLDPE Geomembrane 80 mil and 100 mil <br />• Liner manufacturer began production this week and was sampled by AMEC personnel <br />Thursday the 26th of February. <br />Sheet 3 of 8 <br />VLF Weekly Report WE 02.27.09.13