My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-06_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-03-06_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:11 PM
Creation date
3/10/2009 12:31:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
3/6/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports
From
CC&V
To
DRMS
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />Earth & Environmental <br />2. Sediment Collection Pond <br />• No activities <br />C. Waste Rock to Stockpile <br />1. VLF <br />• On Friday all oversize was hauled using 3 Volvo haul trucks from the <br />LOB/Delivery Road cut to Dump 4, oversized material located in the fill from <br />Stations K4+00 to 8+00 and 0 to 100 foot left was pushed out of the fill area <br />and will be removed at a later date. <br />2. Sediment Collection Pond <br />• No Activities <br />D. Cut to Fill <br />1. VLF <br />• Ames completed placement of structural fill on Tuesday the 24th, along the <br />existing haul road between the 5-point intersection and the crusher maintenance <br />area. The fill placement was to grade the road for drainage away from the <br />sediment retention basin located to the south and direct any run-off toward the <br />retention basin south of the crusher, north of the existing haul road. <br />• Work started on placing structural fill in the VLF from approximate Sta. K4+00 <br />to K8+00 approximately 0-100-feet left of centerline. Fill is being hauled from <br />the LOB/Delivery Road cut. Benching each subsequent lift to remove any <br />frozen or unsuitable material has been achieved with a Cat D-6 dozer while the <br />fill progresses. All fill placed as per method spec. as outlined in the Project <br />Specifications. <br />• All oversize rock >24-inches has not been incorporated in the fill. <br />• Discussions with AMES centered on fill placement, benching, removal of <br />unsuitable materials and method spec for the structural fill. <br />2. Sediment Collection Pond <br />• No Activities <br />E. Subgrade Preparation <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />• Production of the SLF material located in Dump 5 continued intermittently at <br />the clay plant during the week. Continued maintenance problems resulted in <br />reduced production for the week. During the week, a total of 1 I samples were <br />obtained for Index Testing and Proctors. <br />Sheet 2 of 8 <br />VLF Weekly Report WE 02.27.09.1)