Laserfiche WebLink
ArIlL <br />ame <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Project No.: 8420125EO <br />Contractor: Ames Construction Co., Inc. <br />Work Element: Phase 5 CQA/ VLF <br />Date: 2/27/09 Reporting Period: 02/23/09 through 02/27/09 <br />Days S M T W T F S <br />Work Shifts - D D D D D - <br /> - N N N N N - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 15° to 28° High: 33° to 51° <br />AMES, no work delays due to weather this week. <br />AMEC CQA Personnel On-site through the Reporting Period (See Attachment A). <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1. EARTHWORKS <br />A. Clear and Grubbing <br />1. VLF <br />• Ames worked during the week to continue clearing and grubbing activities <br />along the East Perimeter Access Road. Work extended South to Station A6+00 <br />(+/-) left and right of centerline. Pioneer roads were continued to the South for <br />access. Ames used one to two excavators to consolidate grubbed material for <br />loading. <br />• Ames used the Volvo A40D trucks to transport the material to Pad 4 slash pile <br />located North of Ames maintenance facility. <br />• Sediment Collection Pond: no activities. <br />B. Stripping <br />1. VLF <br />• The existing topsoil located near the northwest edge of the Phase 5 VLF. This <br />area is identified by the Contractor as the "substation" area. Work was stopped <br />for the construction of an access pad for Rockbreakers drill rig. <br />• Site has been stripped of all organic and frozen materials, left of Sta.K4+00 to <br />Sta.K8+00 in preparation for structural fill. <br />Sheet 1 of 8 <br />VLF Weekly Report WE 02.27.09.1)