Laserfiche WebLink
4 <br />amec?-Y <br />Earth & Environmental <br />D. Cut to Fill <br />1. LOB Pad <br />• No Activities <br />2. LOB Delivery Road <br />• No Activities <br />E. Sub-grade Preparation <br />1. LOB Pad <br />• No Activities <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />1. LOB Pad <br />• No Activities <br />2. LOB/Delivery Road <br />• No Activities <br />G. Miscellaneous <br />1. Installed erosion control silt fences below the LOB Haul Road. <br />2. Ames office trailers were set-up this week. <br />3. Finished placement of safety berms around Clay borrow <br />4. Finished placement of safety berms around Ames laydown area <br />II. Underground Workings <br />A. Drilling <br /> • No Activities <br />B. Mine Shaft/Stope Remediation <br /> • No Activities <br />C. Lateral/Slot Remediation <br /> • No Activities <br />III. Storm water Management Structures <br />A. LOB Stormwater Culverts <br /> e No Activities <br />B. Roadside ditch <br /> • No Activities <br />C. Best Management Practices (BMPs) <br /> • No Activities <br />Sheet 2 of 7 LOB Weekly Report WE 01.24.09.D.doc