S <br />amec?r <br />Earth & Environmental <br />IV. LOB Geosynthetics <br />A. LLDPE Geomembrane <br />• No Activities <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor, performed visual inspections and surveillance of Ames Activities. <br />Construction observations and surveillance activities consisted of the following: <br />• Performed site continuously throughout the work periods to observe contractor activities. <br />• Observed the removal and placement of top soil in the LOB areas. <br />• No samples of any materials or densities were taken this week. <br />• Al Frias with AMEC Earth and Environmental attended the weekly construction meeting. <br />No night shift work was performed during the week. <br />No work was performed on Saturday, January 24. Currently no work activities are planned for Saturdays <br />but Ames has indicated that Saturday will be used as a make up day in the event of delay or stoppage <br />during the current planned work periods Monday to Friday. <br />I. Testing Summary <br />No testing was performed at this time. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />None noted. <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V <br />Ames Construction: <br />Amec: <br />Others: <br />Daily Safety/Tailgate Meetings: <br />Attended daily safety meetings conducted by the contractor (Ames). <br />Sheet 3 of 7 <br />LOB Weekly Report WE 01.24.09.D.doc