Laserfiche WebLink
amen <br />Earth & Environmental <br />LOB EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Project No.: 8420125EO <br />Contractor: Ames Construction Co. Inc. <br />Work Element: Phase 5 CQA/ LOB <br />Date: 01/27/09 Reporting Period: 01/18/09 through 01/24/09 <br />Days S M T W T F S <br />Work Shifts D D D D D - <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Lows: 17° to 41° Highs: 51° to 70° <br />AMEC CQA Personnel On-site through the Reporting Period (See Attachment A). <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1. EARTHWORKS <br />A. Clear and Grubbing <br />1. LOB Pad <br />• No activities <br />2. LOB/Delivery Road <br />• Contractor pioneered access roads and cleaned work areas this week. <br />• Ames began clearing and grubbing of the LOB haul road this week. The <br />slash was hauled to the Joe Dandy slash stockpile. <br />B. Stripping <br />1. LOB Pad <br />• No Activities <br />2. LOB Delivery Road <br />• Ames began the majority of their stripping operations within the delivery <br />road ROW this week (see attached photos). <br />• Ames was constructing temporary construction roads within the LOB road <br />cut and fill limits. <br />C. Waste Rock to Stockpile <br />1. LOB Pad <br />• No Activities <br />2. LOB Delivery Road <br />• No Activities <br />Sheet 1 of 7 <br />LOB Weekly Report WE 01.24.09.D.doc