Laserfiche WebLink
{ , <br />amec <br />Earth & Environmental <br />C. Waste Rock to Stockpile <br />1. LOB Pad <br />• Ames worked in the LOB Pad area to stockpile excavated material for fill <br />placement in the LOB/Delivery Road between Station 34+50 to 38+00 left <br />of centerline. Generally, Ames used the Komatsu 800 or 385 excavator and <br />a dozer in the pad area for stockpiling. <br />2. LOB/delivery Road <br />• Intermittent stockpiling of cut along the delivery road occurred during the <br />week from Station 24+00 to 35+00. <br />• Ames worked intermittently to widen the construction access up to the Joe <br />Dandy slash pile. This work was not completed by the end of the week. <br />D. Cut to Fill <br />1. LOB Pad <br />• No Activities <br />2. LOB/Delivery Road <br />• Ames continued fill placement for the LOB/Delivery Road from Station <br />34+50 to 38+00 75 to 100-feet left of centerline. Fill placement continued <br />with approximate 24-inch loose fill lifts and compaction using the method <br />specification determined the prior week. Ames completed ramps into the fill <br />location and began using 3 Volvo A40D trucks to transport fill material. <br />• Amec continued observation of fill placement during the week. Fill <br />placement was observed to progress with no issues. The Contractor <br />maintained relatively uniform lifts thickness, moisture conditioning of lifts <br />and cutting of key-ins. Over size material was pushed outside the fill limit. <br />E. Subgrade Preparation <br />1. LOB Pad <br />• No Activities <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />1. Production of the SLF material continued intermittently at the Dump 5 clay <br />processing plant located at the North end of the LOB/Delivery Road. <br />Production was limited due to mechanical breakdowns. <br />2. Ames started setup of a second screening/processing plant located in the <br />VLF (VLF Materials Processing Plant) but was not completed by the end of <br />the week. This plant will not be processing SLF. <br />Sheet 2 of 10 <br />LOB Weekly Report WE 02.21.09