Laserfiche WebLink
<br />amec <br />Earth & Environmental <br />LOB EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ LOB <br />Project No.: 8420125EO <br />Contractor: Ames Construction Co. Inc. <br />Date: 2/24/09 Reporting Period: 02/15/09 through 02/21/09 <br />Days S M T W T F S <br />rk Shifts <br />W D D D D D - <br />o - N N N N N - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 15° High: 33 <br />AMEC CQA Personnel On-site through the Reporting Period (See Attachment A). <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />L EARTHWORKS <br />A. Clear and Grubbing <br />1. LOB Pad <br />• The LOB Pad area was largely completed by the end of the previous week. <br />Minor clean-up work and removal remained to be completed by 2/13 around <br />the mine working #19 and #20 located on the North side of the pad <br />approximately 125-150 feet left of centerline at Station 31+70. This work <br />was still pending the end of week ending 2/21. <br />2. LOB/Delivery Road <br />• The delivery road was largely cleared and grubbed by the end of the week. <br />A small area remained 34+50 to 35+50 right of centerline along the upper <br />shoulder. <br />B. Stripping <br />1. LOB Pad <br />• Ames largely completed topsoil stripping by Monday 2/16. Minor cleanup <br />to waste remained. <br />2. LOB/Delivery Road <br />• Ames largely completed topsoil stripping by Monday 2/16. Minor cleanup <br />to waste remained. <br />Sheet 1 of 10 <br />LOB Weekly Report WE 02.21.09