My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-05_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-03-05_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:07 PM
Creation date
3/6/2009 1:01:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
3/5/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports
From
CC&V
To
DRMS
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
anm?0 <br />B. Mine Shaft/Stope Remediation <br />• AMEC completed a follow-up check of mine workings #18, #19 and #20 <br />within the LOB Pad area. Remediation of these mine workings was not <br />started by the end of the week. No. 20 is an open shaft and needs to be <br />watched for equipment safety while working in the area. No. 18 and 19 are <br />blocked and not fully exposed. The mine working locations are shown in <br />the Attached Figure 1. <br />C. Lateral/Slot Remediation <br />• No Activities <br />III. Stormwater Management Structures <br />A. LOB Stormwater Culverts <br />• No Activities <br />B. Roadside ditch <br />• No Activities <br />C. Best Management Practices (BMPs) <br />• No Activities <br />IV. LOB Geosynthetics <br />A. LLDPE Geomembrane <br />• No Activities <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. Construction observations consisted of the removal and placement of topsoil <br />in the LOB areas. In addition, clearing and grubbing activities were observed in the LOB and the material <br />was stockpiled in the Joe Dandy slash stockpile. <br />No night shift activities were done in the LOB this week. <br />No work was performed on Saturday, February 14. Currently no work activities are planned for Saturdays <br />but Ames has indicated that Saturday will be used as a make up day in the event of delay or stoppage <br />during the current planned work periods Monday to Friday. <br />I. Testing Summary <br />No testing was performed at this time. <br />One sample was collected from the Ames clay processing plant located at the North end of the LOB: <br />Sample SLF-4-C. <br />Sheet 3 of 8 <br />LOB Weekly Report WE 02.13.09
The URL can be used to link to this page
Your browser does not support the video tag.