My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-05_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-03-05_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:07 PM
Creation date
3/6/2009 1:01:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
3/5/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports
From
CC&V
To
DRMS
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
anxz <br />EYjl & EffnifafYT"M <br />C. Waste Rock to Stockpile <br />1. LOB Pad <br />• No Activities <br />2. LOB/delivery Road <br />• No Activities <br />D. Cut to Fill <br />1. LOB Pad <br />• No Activities <br />2. LOB/Delivery Road <br />• Ames started cut to fill of the haul road between Station 36+00 to 36+50 <br />175-feet left of centerline. Initial fill placement was started with 18-inch <br />lifts compacted with 8 passes using a CS-563 vibratory drum compactor. <br />Fill placement was started using a test method placement. <br />• Amec observed the initial fill placement and discussed with Ames to <br />increase the lift thickness to 24-inches and compacting with 4 passes of the <br />CS-563 vibratory drum compactor. Fill material was cut further up slope <br />and between Station 31+00 to 34+00 using a D8 dozer and pushed down <br />slope. <br />E. Subgrade Preparation <br />1. LOB Pad <br />• No Activities <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />1. Production of the SLF material continued at the clay plant throughout the <br />week. Approximately 2,500 (+/-) tons of clay was processed throughout the <br />week based on limited information provided by the Ames. <br />2. Ames started setup of a second screening/processing plant but was not <br />completed by the end of the week. <br />G. Miscellaneous <br />1. No Activities <br />Il. Underground Working <br />A. Drilling <br />• Rock Breakers drilled in the area of the Elkton Mine workings during the <br />week. The Elkton workings area is considered part of the LOB area. <br />Mechanical problems slowed progress during the week. A total of 13 holes <br />were completed for a total of 650 feet based on information from the <br />drillers. <br />Sheet 2 of 8 <br />LOB Weekly Report WE 02.13.09
The URL can be used to link to this page
Your browser does not support the video tag.