ame& <br />LOB EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ LOB <br />Project No.: 8420125EO <br />Contractor: Ames Construction Co. Inc. <br />Date: 2/17/09 Reporting Period: 02/08/09 through 02/14/09 <br />Days S M T WI T F S <br />Work Shifts " D D D D <br /> L_ _ <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 12° High: 32 <br />AMEC CQA Personnel On-site through the Reporting Period (See Attachment A). <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />I. EARTHWORKS <br />A. Clear and Grubbing <br />1. LOB Pad <br />• The LOB Pad area was largely completed by the end of the previous week. <br />Minor clean-up work and removal remained to be completed by 2/13 around <br />the mine working #19 and #20 located on the North side of the pad <br />approximately 125-150 feet left of centerline at Station 31+70. This work <br />was still pending the end of week ending 2/13. <br />2. LOB/Delivery Road <br />• The delivery road was largely cleared and grubbed by the end of the week. <br />A small area remained 34+50 to 35+50 <br />B. Stripping <br />1. LOB Pad <br />• Ames started loading and removal of topsoil from within the LOB Pad limit. <br />The area was largely stripped by 2/13. Minor cleanup of topsoil remained at <br />the end of the week. Ames worked from Station 23+00 to 25+00, right of <br />the centerline to the side slope during the week. <br />2. LOB/Delivery Road <br />• Ames continued to remove topsoil from the LOB between Sta. 23+00 and <br />Sta. 25+00. The topsoil was hauled and placed in the upper stockpile. <br />Intermittent problems occurred with over stripping and hauling of suitable <br />material mixed with topsoil. <br />Sheet 1 of 8 <br />LOB Weekly Report WE 02.13.09