My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-05_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-03-05_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:07 PM
Creation date
3/6/2009 1:01:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
3/5/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports
From
CC&V
To
DRMS
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />amec <br />Earth & Environmental <br />D. Cut to Fill <br />1. LOB Pad <br />• No Activities <br />2. Haul Road <br />• No Activities <br />E. Subgrade Preparation <br />1. Pad <br />• No Activities <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />1. Production of the SLF material continued at the clay plant throughout the week. <br />Approximately 4967 tons of clay was processed throughout the week as provided <br />by Ames in their daily reports. <br />G. Miscellaneous <br />1. AMEC visually inspected the adit located beneath the fill approximately 80 feet <br />left of centerline near Station 37+00 on February 6, 2009. The location of the adit <br />is identified as point 27 shown in Figure 1. AMEC concluded that no remediation <br />would be required because the adit was not located beneath a critical area and it <br />was decided that fill material can be placed directly over the opening. In addition, <br />the Tornado shaft (point no. 15) and an adjacent stope (point no. 16) were visually <br />inspected; however, a remediation method was not decided at the time and <br />additional evaluations would need to be performed by AMEC prior to making a <br />recommendation. <br />II. Underground Working <br />A. Drilling <br />• No Activities <br />B. Mine Shaft/Stope Remediation <br />• No Activities <br />C. Lateral/Slot Remediation <br />• No Activities <br />III. Stormwater Management Structures <br />A. LOB Stormwater Culverts <br />• No Activities <br />B. Roadside ditch <br />• No Activities <br />C. Best Management Practices (BMPs) <br />• No Activities <br />Sheet 2 of 10 LOB Weekly Report WE 02.07.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.